Our Services

Low Cost operation

A solar plant pays back through decades of low running cost. Kamaxi Electricals designs every plant so it needs little attention after commissioning: quality modules and inverters, correctly sized cables, clean cable routing and protection that does not trip without reason.

Since 2011 we have built plants that keep running costs low year after year.

We choose components for long life rather than the lowest first price, use galvanized structures that resist corrosion, and leave clear access for cleaning and inspection. The result is fewer breakdowns, less downtime and more units generated for every rupee spent.

Service Process

How we keep your operating cost low:

  • Tier-1 modules and inverters with long warranties
  • Corrosion-resistant galvanized structures and proper earthing
  • Easy access for cleaning, inspection and remote monitoring
Solar panel array installation by Kamaxi Electricals
Solar plant control room aerial by Kamaxi Electricals
What does it cost to run a solar plant every year?

The main costs are panel cleaning, periodic inspection and occasional replacement of small parts. A well-built rooftop plant usually needs only a small annual maintenance budget compared with its yearly savings.

How often should the plant be serviced?

We recommend a preventive check every six months: tightening connections, checking earthing and protection devices, and reviewing generation data for any drop.

Which parts may need replacement during the plant life?

Panels and structures last 25 years or more. Inverters may need repair or replacement once during the plant life, and fuses, SPDs or connectors occasionally after surges or wear.

Can I monitor my plant's generation online?

Yes. Most string inverters we install come with Wi-Fi or GPRS monitoring, so you can see daily generation on your phone and spot problems early.

Service Options
1

Site Survey & Design

Our engineers study your roof or land, shading and power load to design the right solar system.
2

Documentation & Approvals

We prepare all drawings, agreements and documents needed for subsidy, net-metering and DISCOM approvals.
3

Application Submission

We file your application on the DISCOM and government portals and follow it up until approval.
4

Inspection

We coordinate the DISCOM and electrical inspector visits and handle every technical query on site.
5

Panel Installation

Our trained team installs panels, mounting structures, inverters, ACDB/DCDB and earthing as per standards.
6

Grid Connection

We complete net-meter installation, testing and synchronisation, so your plant starts generating power safely.
Cart (0 items)
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare