Expert Installation
A solar plant is only as good as its installation. Our engineers and site teams install modules, structures, inverters, ACDB/DCDB and earthing as per approved drawings and safety practice, so the plant performs to its design for decades.
Since 2011 our trained teams have installed solar and electrical systems across Gujarat.
Every site has a supervisor who checks structure alignment, torque on fasteners, cable dressing, polarity and insulation before the plant is energised. We test each string, record the results and hand over a complete documentation file.
What expert installation means at Kamaxi Electricals:
- Installation as per approved drawings and safety norms
- String-wise testing and documented commissioning
- Neat cable routing, proper earthing and labelled panels
How long does a rooftop solar installation take?
Most residential rooftop plants are installed in 2 to 4 days once material is on site. Commercial and industrial plants take longer depending on size and structure work.
Do you install on RCC roofs and metal sheds?
Yes. We install elevated GI structures on RCC roofs, low-profile structures on metal sheet sheds and ground-mounted structures on open land.
Who handles DISCOM inspection and net metering?
We do. Our team prepares the documents, coordinates the inspection and follows up until the net meter is installed.
What tests are done before commissioning?
We check open-circuit voltage and polarity of every string, insulation resistance, earthing continuity and the operation of protection devices before the plant is switched on.